Page 84 - ingilizce
P. 84
Table 8. Investment budget for small-scale vermicomposting facility
Total Price
Equipment&Material Quantity Unit Price
(Euro)
IBC Tank 10 40 400
Transport IBC 1 200 200
Gravel (150 kg) 1 150 150
Sand (100 kg) 1 50 50
Wood for lids 10 25 250
Palets 20 3 60
PVC Pipes (3 meter) 10 5 50
Manure (kg) (farm waste) 4.000 0 0
Irrgigation pipes (3 meter) 2 5 10
Earhworms (E. fetida) (kg) 10 90 900
Sprinklers 50 0,4 20
Haystacks 4 25 100
Thermometer 1 84 84
Hygometer 1 106 106
Total Budget 2.380
Table 9. Machinery and equipment required for worm compost production in continuous flow
system
Quantity Total Price
Material/Equipment name
(Piece/Kg) (Euro)
Earthworm 500.000 5.000
Continuous Flow System 5 54.000
Heat Treatment Furnace 1 8.000
Fertilizer Mill / Crusher 1 4.800
Vibrating Fertilizer Screening Machine 1 1.900
Fertilizer Packaging Machine 1 9.100
Pellet Machine 1 6.900
Forklift 1 31.650
Office Furnishing 1 3.200
Total - 124.550
77